Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

Drain not working

Reported by Angela Vanderpluym at 14:44, Fri 16 March 2018

Water draining from Stablebridge road flows over the drain pipe rather than in it. It then floods the canal footpath and is washing the towpath away into the canal. According to BCC 'no planned repair is necessary at this stage' yet water is not draining properly. This one drain appears to take all the water from the Upper Icknield Way on down and is not coping. Railing over the bridge is also still non-existent.

Topic:

optional

Don't like forms?

You can email technical support directly.