You are reporting the following problem report for being abusive, containing personal information, or similar:
End of Sandy Rise - which is maintaioned by BCC Reported anonymously at 14:36, Tue 28 September 2021 At the end of Sandy Rise, some 6 plastic roadwork barriers (maybe 2.5 metres by 1 metre) have been left, by one of your contractors. these have been here fpr about 6 to 8 weeks. They are unsightly and have just been thrown into the undergrowth amongst the weeds. a small lorry is required to remove these. Thank you for removing them asap.
At the end of Sandy Rise, some 6 plastic roadwork barriers (maybe 2.5 metres by 1 metre) have been left, by one of your contractors. these have been here fpr about 6 to 8 weeks. They are unsightly and have just been thrown into the undergrowth amongst the weeds. a small lorry is required to remove these. Thank you for removing them asap.
If you want to report a street problem, return to the homepage and enter your postcode. You can then make a report. We'll send it to your council, and publish it on the site.
If your problem is not a street issue, or is not suitable for publication on the site, then this isn't the right place for it. You should find other contact details on the council’s website.
If you'd like to update a report, please leave an update on the report’s page, underneath the report details.
You can email technical support directly.