Contact the team

You are reporting the following problem report for being abusive, containing personal information, or similar:

Bollards not reinstated correctly

Reported anonymously at 09:14, Thu 4 November 2021

Following some drainage works by Steve Williams Construction West Midlands they have re-installed the bollards on both ends of the alley incorrectly. On the A40 side, 2 bollards very close to each other (and to the left-hand fence) with the 3rd bollard missing and therefore over a 1 m gap left between them and the right-hand fence, making them almost pointless. There should be 3 bollards on either end of the alley (see Google Maps photos of how it used to look) and they need to be placed correctly apart to serve their actual purpose. My previous report (40177346) was closed stating you had contacted me separately, but nothing has been received. Junk/spam/promotions/etc. have all been checked and nothing. Please can you get this sorted.

Topic:

optional

Don't like forms?

You can email technical support directly.