Entrance to Manor farm and entrance to New nursery farm

Reported anonymously at 19:45, Thu 22 September 2022

You re- surfaced the road A4129 about 6 months ago , the road was planned of to depth of 200mm when the new surface was re- laid it was the same height as the kerbs to New nursery farm thus causing flooding to the yards and buildings also serval of the kerbs were broken the entrance to manor farm the new surface is now 80 to 100mm lower than kerbs this is causing serious damage to vehicles entering and leaving . i have asked serval times for this to be put right . if this is not corrected before the rain starts falling i will be looking for compensation for the flooding to the buildings and damage to the vehicles , i would estimate already well above £10,000 thanks