Back to all reports

Multiple potholes and surface failure

Reported in the Road surface category anonymously at 07:10, Wednesday 29 January 2020

Received by Buckinghamshire Council moments later

Potholes now expanded into a significant surface breakup and failure... Underneath the bridge at the exit from the roundabout heading down station road.

Was previously large deep potholes but the situation is now deteriorating rapidly.

Over the last week individual potholes have grown in size and depth, and have joined together to make a large patch where the road surface is rapidly falling.

It is now no longer possible to avoid the holes and traffic is now having to slow to cross the broken up area.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 07:15, Wednesday 29 January 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 08:34, Wednesday 29 January 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 08:34, Wednesday 29 January 2020

  • There was an attempted repair but this has failed within days as the contractor did not do the job properly. It still needs fixing.

    Posted anonymously at 18:44, Tuesday 4 February 2020

  • The rise surface has been deteriorating by the day and nothing had been done for weeks.

    Posted anonymously at 08:20, Wednesday 26 February 2020
    Still open, via questionnaire

  • Still not been fixed

    Posted anonymously at 19:33, Sunday 1 March 2020

  • We are pleased to tell you that the repair of this defect is now complete.

    The reports you make to us are invaluable, they help us achieve our pledge to always put safety first by prioritising the most critical repairs, being available to react 24/7 and regularly inspecting the highway

    Regards
    Transport for Buckinghamshire

    State changed to: Fixed

    Posted by Buckinghamshire Council at 09:44, Wednesday

This report is now closed to updates. You can make a new report in the same location.