Two drains on the side of the road going into Waddesdon outside 118 High Street

Reported in the Pothole category anonymously at 13:03, Fri 15 May 2020

Received by Buckinghamshire Council moments later

There are two drains on the road (A41) next to my house, 118 High Street, Waddesdon HP180JF. The road is very busy with HGV traffic. Each time a lorry or heavy vehicle runs over these two drains, my house shakes. My house is over 400 years old and not built to withstand over 100 small earthquakes a day. The asphalt around the two drains is worn away and very bumpy causing these issues. I think the drains need to be re-done and the road around them resurfaced smoothly.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 13:03, Fri 15 May 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 10:44, Tue 19 May 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 10:44, Tue 19 May 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 10:46, Tue 19 May 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 09:06, Wed 20 May 2020

  • Thank you for your report, the repair of this defect is now in progress.
    We will continue to update you by email when your report reaches key stages.
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 12:00, Mon 8 June 2020

  • We are pleased to tell you that the repair of this defect is now complete.

    The reports you make to us are invaluable, they help us achieve our pledge to always put safety first by prioritising the most critical repairs, being available to react 24/7 and regularly inspecting the highway

    Regards
    Transport for Buckinghamshire

    State changed to: Fixed

    Posted by Buckinghamshire Council at 14:47, Mon 8 June 2020