Just outside 219 Wendover Road HP21 9PB. Cant select the correct location on the map.t it correctly on the map

Reported in the Blocked drain category anonymously at 11:31, Mon 17 August 2020

Received by Buckinghamshire Council moments later

The drain on the main road is blocked Causing causing the rain water to run into our shared driveway. This means that you can not walk out of the driveway and all the silt is building up on the tarmac and then transferring onto our drives. The drain is just outside on the left as you come out of the drive. The drive is located off the roundabout at the top of Bedgrove on the Wendover road

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 11:32, Mon 17 August 2020

  • Thank you for your report.

    We have recorded it and will consider it when we are planning future works in the area. Please note we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.
    Our Highways Inspection Policy can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 09:02, Wed 19 August 2020

  • State changed to: Open

    Updated by Buckinghamshire Council at 16:02, Thu 3 September 2020

  • Thank you for your report.

    We have recorded it and will consider it when we are planning future works in the area. Please note we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.
    Our Highways Inspection Policy can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 15:22, Thu 15 October 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 15:06, Fri 30 October 2020

  • Thank you for your report; we are pleased to advise that the repair of this defect is now in progress. We will continue to update you by email when your report reaches key stages.
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 15:11, Fri 30 October 2020

  • We are pleased to tell you that the repair of this defect is now complete.

    The reports you make to us are invaluable, they help us achieve our pledge to always put safety first by prioritising the most critical repairs, being available to react 24/7 and regularly inspecting the highway

    Regards
    Transport for Buckinghamshire

    State changed to: Fixed

    Posted by Buckinghamshire Council at 15:11, Fri 30 October 2020

  • State changed to: Open

    Updated by Buckinghamshire Council at 12:43, Tue 24 November 2020

  • Thank you for your report; the repair has been added to our programme of works.
    Unfortunately, we are unable to provide you with a timescale for this work to be carried out as we programme the work on a priority basis (in line with our Highway Inspection Policy). This does mean that sometimes planned programme times may need to be changed due to priority based working.
    Please be assured this problem is on our list of works to be carried out. We will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below:
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 14:17, Mon 21 December 2020

  • I was told that there are tree roots blocking the drain and that work would be scheduled in the new year. We are now in June and there has been no work carried out to clear the drains. Please can somebody advise when this work is planned to be completed.

    Posted anonymously at 14:39, Wednesday 16 June 2021

  • The drain is still blocked. I was written to by Zoe Ford on the 22/12/20 following a complaint about how this has been handled. Her email stated:

    ************** With regards to the blocked drain outside your property on the Wendover Road, I am sure you are aware that our crews have now attended and I wanted to update you with their findings.

    Unfortunately the crews located a huge root ball in the drainage line outside your property, the root ball was so dense that the root cutter was unable to cut through and clear the line. To unblock the drainage line now requires excavation and replacement of the pipe.

    A works order has already been placed and I have requested that this work is expedited for the new year. ******** This work has still not been competed. I asked for an update on here on the 16th June and there has been no update.

    Can somebody provide a date for when the works is going to be completed.

    Posted by Paul Brown at 16:06, Tuesday 10 August 2021

Only the original reporter may leave updates. If you made the original report please log in to leave an update.