When it rains the drain appears to be blocked. This means it overflows onto the road & subsequently down the pavement & into our driveway at Lindfield. During the recent cloud burst the water was 10cm deep & extend over our entire drive an area approx. 5m X 10m . The remaining water continues to flow down the road into the drain outside Timbers. This is now happening everytime we have heavy rain. This problem needs to be fixed soon as the water nearly came over our doorstep.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 14:07, Fri 28 August 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 12:10, Fri 4 September 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 12:10, Fri 4 September 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 12:10, Fri 4 September 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 08:03, Tue 8 September 2020

  • State changed to: Open

    Updated by Buckinghamshire Council at 10:29, Tue 8 September 2020