Flooding outside 117 Chapel Lane

Reported via desktop in the Ditch issue category by Cllr Darren Hayday at 12:46, Thu 19 November 2020

Received by Buckinghamshire Council moments later

Since this road was resurfaced, they have built up the road surface to high and as a result, when there is heavy flooding, the water comes down the drop kerb outside 117 Chapel Lane and down the driveway to 119 Chapel Lane, causing lots of flooding. Please as the local member may I ask that this problem is resolved?

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 12:46, Thu 19 November 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 11:25, Thu 3 December 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 11:25, Thu 3 December 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 11:26, Thu 3 December 2020

  • State changed to: In progress

    Updated by Buckinghamshire Council at 12:54, Thu 3 December 2020