A blockage somewhere in drainage system is causing overflowing on one of the drains in Lower Green Lane, Chearsley, following heavy rain.

This in turn is causing damp in the cellar of an adjacent property - Cloverdale - owners Mr & Mrs D.Sampson.

A full investigation of the run off within the system is neccessary - and initial clearance of the ditch at the bottom of Lower Green Lane may provide clues to the layout of the drainage system, which hopefully allow a permanent resolution of the problem. The owner of an adjacent property - Long Meadow, Ann Persson - has given permission for equipment to carry out the clearance work to access the ditch via the gate at the top end of her field, providing proper notice of the works is given

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 16:41, Thu 19 November 2020

  • Thank you for your report; the repair has been added to our programme of works.
    Unfortunately, we are unable to provide you with a timescale for this work to be carried out as we programme the work on a priority basis (in line with our Highway Inspection Policy). This does mean that sometimes planned programme times may need to be changed due to priority based working.
    Please be assured this problem is on our list of works to be carried out. We will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below:
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 15:15, Fri 20 November 2020

  • Thank you for your report.

    This has been added to our programme of works. Unfortunately, we are unable to provide you with a timescale for this work to be carried out, we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 15:15, Fri 20 November 2020

Only the original reporter may leave updates. If you made the original report please log in to leave an update.