Back to all reports

Bayleys Bottom HP10 8PD

Reported via desktop in the Pothole category anonymously at 14:15, Tue 1 December 2020

Received by Buckinghamshire Council moments later

The original potholes were reported several times before August 2020. Temporary fillings were put in some of the potholes in September 2020 with cones indicating where the work wasn't fully completed. The temporary fillings are now beginning to break up leaving more potholes as shown in the photos. When the road floods as it often does (see photo from 12th November), these potholes will not be visible and could serious damage to cars, cycles or even pedestrians wading through the floods (we had to on the 12th Nov.). Would it not be more economical if the contractors hired to do temporary repairs did a permanent repair? Now, presumably there will be another temporary repair adding even more to the eventual cost.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 14:15, Tue 1 December 2020

  • Thank you for your report; the repair has been added to our programme of works.
    Unfortunately, we are unable to provide you with a timescale for this work to be carried out as we programme the work on a priority basis (in line with our Highway Inspection Policy). This does mean that sometimes planned programme times may need to be changed due to priority based working.
    Please be assured this problem is on our list of works to be carried out. We will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below:
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 08:54, Tue 8 December 2020

Only the original reporter may leave updates. If you made the original report please log in to leave an update.