Blocked Drain

Reported via desktop in the Blocked drain category anonymously at 08:49, Sunday 31 January 2021

Received by Buckinghamshire Council moments later

Badgers Brake is a property that has an open ditch. The ditch is for run off water from school woods to travel down to reach Burnham Beeches. The importance to Natural England of this water supply has been made clear to us. However as you can see from the pictures we are flooding. The water is not draining away. I believe the water is also over spilling and flooding to the properties in front of us as well. The water reaches the edge of our property and then enters a culvert which runs underneath the property in front of us and out to a drain in the road. The manhole cover is between Firkin and Orchard Cottage on One Pin Lane. We have 'rodded' the culvert from our property at least 20 foot. The blockage is further down the culvert, where the culvert meets the One Pin Lane drain. We need someone to clear the drain on One Pin Lane. Thank you

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 08:49, Sunday 31 January 2021

  • I probably should say that this photo is of the ditch (culvert entrance under fence panel) which is about 2 foot deep, and as you can see it has completely over spilled. With the amount of rain atm if this is not resolved soon our garage (building on left in picture) will flood.

    Posted anonymously at 08:59, Sunday 31 January 2021

  • Thank you for your report; the repair has been added to our programme of works.
    Unfortunately, we are unable to provide you with a timescale for this work to be carried out as we programme the work on a priority basis (in line with our Highway Inspection Policy). This does mean that sometimes planned programme times may need to be changed due to priority based working.
    Please be assured this problem is on our list of works to be carried out. We will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below:
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 10:20, Wednesday 17 February 2021

  • State changed to: In progress

    Updated by Buckinghamshire Council at 12:26, Wednesday 17 February 2021

  • We are pleased to tell you that the repair of this defect is now complete.

    Please consider completing our short survey below on how you found the repair;
    https://forms.gle/ FywWv2ZGrGb9XgCu8

    The reports you make to us are invaluable, they help us achieve our pledge to always put safety first by prioritising the most critical repairs, being available to react 24/7 and regularly inspecting the highway.

    Regards
    Transport for Buckinghamshire

    State changed to: Fixed

    Posted by Buckinghamshire Council at 08:40, Monday 22 March 2021

This report is now closed to updates. You can make a new report in the same location.