In progress
Large flood during every rainfall
Reported via mobile in the Ditch issue category anonymously at 21:27, Monday 1 February 2021
Received by Buckinghamshire Council moments later
The section of road between properties"Barton Colyers" on one side of the road and "Hazel Cottage" and "Cedars Lodge" on the other side frequently floods badly during rainfall to the point that the whole verge and part of Hazel Cottage driveway is under water . This is because the 2 gullies outside Hazel Cottage and Cedars Lodge and the 1 or 2 weirs outside Barton Colyers are blocked. Bucks CC jetted the drains in the road last year but this did not clear these drains and they flooded again shortly afterwards. It will need a professional drain clearing team and equipment and some patience to actually find and properly clear the blockages, not a quick drive by 10 minute job.
Updates
-
Thank you for your report which is currently under review.
We will investigate this and if you have provided an email address, we respond to you within 10 working days.
We will continue to update you by email (if provided) when your report reaches key stages.
IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
Regards
Transport for BuckinghamshirePosted by Buckinghamshire Council at 21:27, Monday 1 February 2021
-
Thank you for your report; the repair has been added to our programme of works.
Unfortunately, we are unable to provide you with a timescale for this work to be carried out as we programme the work on a priority basis (in line with our Highway Inspection Policy). This does mean that sometimes planned programme times may need to be changed due to priority based working.
Please be assured this problem is on our list of works to be carried out. We will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below:
www.buckscc.gov.uk/highwaysinspectionpolicy
Regards
Transport for BuckinghamshireState changed to: Action scheduled
Posted by Buckinghamshire Council at 10:22, Wednesday 17 February 2021
-
State changed to: In progress
Updated by Buckinghamshire Council at 10:23, Wednesday 17 February 2021
-
Thank you for your report; the repair has been added to our programme of works.
Unfortunately, we are unable to provide you with a timescale for this work to be carried out as we programme the work on a priority basis (in line with our Highway Inspection Policy). This does mean that sometimes planned programme times may need to be changed due to priority based working.
Please be assured this problem is on our list of works to be carried out. We will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below:
www.buckscc.gov.uk/highwaysinspectionpolicy
Regards
Transport for BuckinghamshireState changed to: Action scheduled
Posted by Buckinghamshire Council at 14:20, Wednesday 17 February 2021
Only the original reporter may leave updates. If you made the original report please log in to leave an update.