Footpath passing 44, 43, 42, 41, 40, 39, 38 Pemberton Close onwards

Reported via desktop in the Footpath / pavement problem category anonymously at 09:44, Friday 12 March 2021

Received by Buckinghamshire Council moments later

Footpath is crumbling and made up of a mixture of materials due to various maintenance works having been undertaken over the years. Footpath is sunken approximately 3 inches from the level of the kerb and is uneven to walk on. There are a number of elderly residents who struggle to walk with frames along this path. Footpath has been like this to some degree since we moved here in 2016 but has deteriorated further over time.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 09:44, Friday 12 March 2021

  • Thank you for your report.

    This has been added to our programme of works.
    Unfortunately, we are unable to provide you with a timescale for this work to be carried out as we programme the work on a priority basis (in line with our Highway Inspection Policy). This does mean that sometimes planned programme times may need to be changed due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 10:41, Tuesday 16 March 2021

  • State changed to: In progress

    Updated by Buckinghamshire Council at 10:41, Tuesday 16 March 2021

  • Thank you for your report.

    This has been added to our programme of works.
    Unfortunately, we are unable to provide you with a timescale for this work to be carried out as we programme the work on a priority basis (in line with our Highway Inspection Policy). This does mean that sometimes planned programme times may need to be changed due to priority based working.

    Please be assured this is on our list of works to be carried out, we will continue to monitor all defects to ensure the safety of our residents as part of our Highways Inspection Policy which can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 10:41, Tuesday 16 March 2021

  • Two injuries have occurred since this was first reported. Two children have fallen over on separate incidents on the uneven path surface and have scraped themselves on the gravel and crumbling concrete/tarmac that litters the path where it is in disrepair. Can you confirm approximately when this will be addressed? Many thanks