Back to all reports

Bollards not reinstated correctly

Reported via desktop in the Bollards or railings category anonymously at 09:14, Thu 4 November 2021

Received by Buckinghamshire Council moments later

Following some drainage works by Steve Williams Construction West Midlands they have re-installed the bollards on both ends of the alley incorrectly. On the A40 side, 2 bollards very close to each other (and to the left-hand fence) with the 3rd bollard missing and therefore over a 1 m gap left between them and the right-hand fence, making them almost pointless. There should be 3 bollards on either end of the alley (see Google Maps photos of how it used to look) and they need to be placed correctly apart to serve their actual purpose.

My previous report (40177346) was closed stating you had contacted me separately, but nothing has been received. Junk/spam/promotions/etc. have all been checked and nothing. Please can you get this sorted.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.

    IMPORTANT: To report anything dangerous, please call us on: 0300 131 6000

    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 09:14, Thu 4 November 2021

  • Morning, there was apparently an incident yesterday where a father had to run after his child as they cycled straight down the alleyway towards the A40. We really need to get the bollards reinstated correctly before a serious accident happens.

    Posted anonymously at 09:38, Sun 7 November 2021

Only the original reporter may leave updates. If you made the original report please log in to leave an update.